Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP22-0033
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Follow-up | Not Ready | ||
01/05/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | There’s no concern at this this time | |
01/12/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time. | |
01/27/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
02/02/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Desert Services is on site is starting to install and stake off 400 Lf. of wattle (location)North and NW section of wrought iron fence per State of AZ Environmental Rep request due to a site visit last week. General site conditions are muddy due to rain and Zach Cole will recall inspection next week when site conditions dry out. |
|
02/09/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | 400 lf. of wattle is set in place from NW end of wrought iron perimeter fence to SW corner of wrought iron fence. Clean up and grading continues in the SW to NW section of site and wattle will be adjusted accordingly as work to prepare for asphalt continues. No concerns at this time. |
|
02/17/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | There are no concerns at this time on this site minor truck out noted but nothing outside of private property | |
02/23/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Grading and asphalt work continues at the SW and NW section of parking lot area. Landscaping is in progress for the SW and NW section of parking lot area. All setup and controls are in place, no concerns at this time. |
|
03/08/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Site is muddy from recent rains, no concerns at this time, all setup and controls are in place. | |
03/10/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
03/16/2023 | SITE - Stormwater Follow-up | Not Ready | I need to reschedule for Monday catch basins not ready | |
03/17/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
03/22/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | All setup and controls are in place and are no concerns at this time. Grading work still continues on the NW West and SW sections of site. |
|
03/24/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time everything seems to be good | |
04/05/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | All setup and controls are in place and are no concerns at this time. | |
04/14/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Zac, Cole | |
04/21/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Minor track out noted | |
04/19/2024 | SITE - Stormwater Follow-up | Partial Pass | Zach | |
05/05/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time with track out for the apartment complex at 4500 South Landings Way | |
05/10/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | There appears to be no concerns at this time during this Inspection. Additional comments on Site Inspection: Zach Cole was contacted at (620) 212-3189 and we discussed the current and future needs for this site. Currently we will be looking at this site to see how it is looking on the perimeter of Building #7 located at the northwest corner of this project. Some flat work around or adjacent to this building, plus development of the dog parks west of this site, and general site cleanup and maintenance is being performed currently. We have discussed that we should perform more in-depth Inspections on all of the Buildings 1 - 7 in the coming weeks so we can ensure that all of the work has been completed per the Approved Plans. This work will be scheduled starting next week for all buildings and site. |
|
05/17/2024 | SITE - Stormwater Follow-up | Passed | ||
05/17/2024 | SITE - Stormwater Follow-up | Passed | ||
05/24/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns on the STORMWATER follow up at this time | |
06/07/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
06/30/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time after driving through the site | |
07/13/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time. Everything still looks good. | |
07/28/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
08/11/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | NO CONCERNS AT THIS TIME, MINOR TRACK-OUT NOTED ON THE INTERNAL ROADWAY BUT NOTHING OUT ONTO IRVINGTON ROAD. | |
08/11/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | NO CONCERNS AT THIS TIME, MINOR TRACK-OUT NOTED ON THE LOCAL STREETS BUT NOTHING OUT ONTO IRVINGTON ROAD. | |
08/14/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Contractors install an 18 inch storm drain between the last two buildings on the east side | |
08/17/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Trash enclosure at SW end of site has all vertical rebar installed for 1st lift grouting. The trench and 12” storm pipe are installed for the courtyard South end area and are to be backfilled. |
|
08/18/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | East and West section of trench completed for courtyard storm pipe, trench continuing South is to be called in for Monday. | |
08/21/2023 | SITE - Stormwater Follow-up | Partial Pass | contractor installed the H.D .IN THE COURT YARD AREA 180 LF. 12IN. | |
08/22/2023 | SITE - Stormwater Follow-up | Not Ready | Day’s Contracting not on site due to site condition from storm will recall when trench is cleaned out and 12” pipe is in trench. | |
08/24/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | 70’ section of 12” pipe in South end courtyard is okay to backfill. | |
08/30/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Trench bedding and 12” pipe at North end of courtyard heading East is ready for backfill. | |
08/30/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Trench bedding and 12” pipe ready for backfill on far North end of courtyard heading west. | |
09/22/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No Concerns at this time | |
10/06/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Storm water drain at NE end of parking garage section needs to have filter fabric installed, and a general trash and loose debris clean up is need thru out perimeter fence areas and common parking area for trades on Eastside of site. | |
10/20/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Spoke to Zach Cole regarding storm water drain located at SE section of parking lot at South end of garage structure to remove dirt piles and concrete debris from parking lot and cover storm drain with filter fabric. | |
10/21/2022 | SITE - Stormwater Follow-up | Re-inspection required | ||
11/03/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Filter fabric has been installed per request in storm drain located in SE parking lot at South end of parking garages. | |
11/14/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | Contractor continues to install the 24 inch DP storm drain | |
11/16/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | Everything is good at this time no changes | |
11/22/2022 | SITE - Stormwater Follow-up | Re-inspection required | STORMWATER follow-up good at this time no concerns | |
11/28/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | Need to reset the waddles on the north east quadrant of the property | |
11/29/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No,issues at this time | |
11/30/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | Forming up a catch basin on the south east quadrant and backfilling 24 inch HD pipe along side the east side of property line | |
12/02/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | NO CONCERNS AT THIS TIME, THE CONTRACTOR WILL PROVIDE PHOTOS FOR THE PIPE THAT THEY ARE CURRENTLY BACKFILLING | |
12/07/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | Play some 12 inch HDPE pipe cross the road from east to west on the east end of the building | |
12/08/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | Okay the backfield the 18 inch HDP | |
12/14/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | Foreman the catch bases on the east side of the project to him good to pour for tomorrow morning | |
12/29/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | NW area where curb and sidewalk are terminated has a void under fence leading to adjacent property, Superintendent was informed and will fill void in with dirt and rock. |