Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP22-0033
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
01/12/2024 | ENGR Engineering Final | Partial Pass | TC Of O Level 4 Building (2) South End units (2101) thru (2308) Total of (24) units (Only). Handicap parking sign located on South end of Building (2) is in front of large transformer requiring allotted space to open both front doors will need to review area to see if sign can be mounted in another location. |
|
01/18/2024 | ENGR Engineering Final | Partial Pass | TC Of O Level 4 Building (1 ) all 12 units. TC Of O Level 4 Building (2) remaining 18 units on North end totaling (42) units for building (2). |
|
04/02/2024 | ENGR Engineering Final | Partial Pass | Looked at Buildings 3-5 for possible TCO’s to be requested on Thursday of this week | |
04/05/2024 | ENGR Engineering Final | Partial Pass | TC Of O level #4 for building (3) Buildings (4) & (5) will have parking lot stripping and Handicap parking signage completed next week. |
|
04/19/2024 | ENGR Engineering Final | Partial Pass | striping buildings four and five. Zach | |
05/10/2024 | ENGR Engineering Final | Not Ready | Zach Cole was contacted at (620) 212-3189 and we discussed the current and future needs for this site. Currently we will be looking at this site to see how it is looking on the perimeter of Building #7 located at the northwest corner of this project. Some flat work around or adjacent to this building, plus development of the dog parks west of this site, and general site cleanup and maintenance is being performed currently. We have discussed that we should perform more in-depth Inspections on all of the Buildings 1 - 7 in the coming weeks so we can ensure that all of the work has been completed per the Approved Plans. This work will be scheduled starting next week for all buildings and site. | |
05/17/2024 | ENGR Engineering Final | Passed | ||
05/17/2024 | ENGR Engineering Final | Passed | ||
07/09/2024 | ENGR Engineering Final | Passed | Engineers letter has been received from Rick Engineering on 7/9/2024. Once letter is received from the engineer on record that no other work needs to be done on the drains ways from building drains into the basins and water harvesting areas and this is signed as acknowledgment by the owner in understanding this then this DP inspection will be signed off on and passed. Pictures will be taken today of the attempt to repair and again after the next storm. |
|
07/11/2024 | ENGR Engineering Final | Passed | Engineers letter has been received | |
11/03/2023 | ENGR Engineering Final | Not Ready | Will recall inspection 11/8 of next week. | |
11/09/2023 | ENGR Engineering Final | Partial Pass | Contractor is good for level two. TCO. For the clubhouse only. | |
11/29/2023 | ENGR Engineering Final | Not Ready | ||
12/01/2023 | ENGR Engineering Final | Partial Pass | OK for a level four on the clubhouse for occupancy. All of the buildings will need additional inspections. | |
12/04/2023 | ENGR Engineering Final | Partial Pass | ||
12/05/2023 | ENGR Engineering Final | Partial Pass | TC of O level 4 Building #6 and Clubhouse (only) Landscape and Stormwater runoff areas in progress. |