Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/14/2022 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Filter fabric Correction as noted has been completed. John with Barker Morrissey at 909-6352
2075 E BENSON HY
|
| 10/14/2022 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Filter fabric Correction as noted has been completed. John with Barker Morrissey at 909-6352
2101 E BENSON HY |
| 10/13/2022 |
ENGR Engineering Final
|
MHERNANDEZ |
Continued |
Entered by NGARCIA3 - CN /NO FILTER FABRIC IN AT THE BASIN WHERE THEY ADD RIP RAP INSTEAD OF D.G.
2075 E BENSON HY |
| 10/13/2022 |
ENGR Engineering Final
|
MHERNANDEZ |
Continued |
Entered by NGARCIA3 - CN /NO FILTER FABRIC IN AT THE BASIN WHERE THEY ADD RIP RAP INSTEAD OF D.G.
2101 E BENSON HY |
| 09/23/2022 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by NGARCIA3 - IS PARTIAL COMPLETE ALL WORK ON BOTH SITES PRIOR TO SCHEDULING THE FINAL
2101 E BENSON HY |
| 09/23/2022 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by NGARCIA3 - IS PARTIAL COMPLETE ALL WORK ON BOTH SITES PRIOR TO SCHEDULING THE FINAL
2075 E BENSON HY |
| 10/24/2022 |
ENGR Engineering Final
|
|
Passed |
|
| 11/14/2023 |
ENGR Engineering Final
|
|
Passed |
|