Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 09/23/2022 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Partial Approval | Entered by NGARCIA3 - IS PARTIAL OK FOR USE OF THE PARKING LOT 2101 E BENSON HY |
| 09/23/2022 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Partial Approval | Entered by NGARCIA3 - IS PARTIAL OK FOR USE OF THE PARKING LOT 2075 E BENSON HY |
| 09/29/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Various trees thru out site do not have stakes or only one stake per tree. The two center drainage medians on East side of parking lot will not retain water due to landscape material and trees are to high. Retention area located at NE rear of parking lot has no filter fabric under rip rap areas. |
|
| 11/08/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Need plans for further review. | |
| 11/14/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 11/14/2023 | PDSD Site/Engineering Division - Landscaping | Passed |