Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/02/2026 |
Consultation SITE |
|
Partial Pass |
Visited site, discussed need for revision/conversion to tentative plat. will schedule follow up inspections for next week to assess site conditions including sidewalks. |
| 01/05/2026 |
Consultation SITE |
|
Failed |
General site visit to assess state of development package. Issues identified have been listed in the inspection summary. |
| 02/20/2026 |
Consultation SITE |
|
Passed |
Site meeting to discuss issues with sidewalks and grading. |
| 12/29/2025 |
Consultation SITE |
|
Passed |
12/29/25 - Unable to reach contractor in person or on the phone. Site visit to assess state of progress. Current status: asphalt pavement throughout site is complete without inspection, driveway slopes don't match plans, curb cuts missing on west side of parking area, will cause standing water, below-grade storm drain pipes have been installed with no record of inspection, landscape planting has not started yet. Inspections needed: sidewalk/flatwork, paving, water harvesting, drainpipe/stormwater, grading. Current issues: bldg. 15 sidewalk is over 15% running slope, 2 curb cuts are missing in the parking area, storm drain pipe in center of development daylights into WHIA on both ends; slope unknown, asphalt used in place of stamped concrete. |