Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP21-0352
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | Not Ready | ||
10/11/2022 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. Andrew with G and J. Grading improvements and water retention areas to start shortly. Please schedule inspections on a regular basis And as needed when grading activities begin. |
03/08/2022 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by VVERA1 - Partially approved. Andrew with G and J. At 367-7021. On site until 1:30 PM. New building structure and existing site. Address is posted. Keep all project materials on site. schedule inspections biweekly or sooner as needed. Two water retention areas for this project. |
03/14/2023 | PDSD Engineering Division Pre-Construction SITE | Complete (Recurring) | Contractor installed drainage pipe and French drain on the west side of the building none of the piping drainage was inspected by the City Of Tucson. I will form the contractor that he would need to have engineer of record approve all the drainage and the pipe installation. Also informed the contractor that he needed to call in inspections every two weeks. | |
03/16/2023 | PDSD Engineering Division Pre-Construction SITE | Complete (Recurring) | Contractors for me to sidewalk from the main building on the west side to another small building on that west side everything looks good as of today | |
04/10/2023 | PDSD Engineering Division Pre-Construction SITE | Passed |