Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP21-0352

Parcel: 13313005F


Addresses:

7525 E SPEEDWAY BL

Inspection Status: Not Ready

Inspection History: PDSD Site/Engineering Division - Landscaping

Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping Not Ready
10/27/2022 PDSD Site/Engineering Division - Landscaping Not Ready
04/10/2023 PDSD Site/Engineering Division - Landscaping Partial Pass contractor needs to remove the rip rap that was installed and place filter fabric and reinstall Rip rap and installed DG in the front area
04/10/2023 PDSD Site/Engineering Division - Landscaping Partial Pass Contractor needs to remove the riprap and install filter fabric and then install the riprap. And install the DG in front of the building
04/25/2023 PDSD Site/Engineering Division - Landscaping Passed
04/25/2023 PDSD Site/Engineering Division - Landscaping Passed