Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP21-0344
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/14/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. Catch basin as shown. Rick/ at 602-908-0212 |
01/17/2023 | ENGR Grading Final | Complete (Recurring) | It’s raining out here it’s too wet to inspect. Inform the contractor that he needs to call in for footing inspection for the trash enclosure. Gave the contractor a copy of the detail plans for trash enclosure. | |
01/31/2023 | ENGR Grading Final | Complete (Recurring) | Rebar inspection for trash enclosures good to go they can pour | |
02/09/2023 | ENGR Grading Final | Complete (Recurring) | Contractor called me in for the grouting on trash enclosure. It’s good To grout all the walls | |
02/16/2023 | ENGR Grading Final | Complete (Recurring) | Contractor called in for rebar inspection for trash enclosure the floor and the apron. They can pour it | |
03/07/2023 | ENGR Grading Final | Complete (Recurring) | Contractor still needs to finish landscaping railing DG | |
03/23/2023 | ENGR Grading Final | Passed | ||
03/23/2023 | ENGR Grading Final | Passed | ||
03/23/2023 | ENGR Grading Final | Passed | ||
03/23/2023 | ENGR Grading Final | Passed |