Inspection History Details
Inspection Status: Passed
Inspection History
Permit Number - DP21-0316
Inspection Description -
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2025 | Passed | Grading rough, all roads are roughed and cut to grade, basins are in better than rough condition with grade cut and sloped , building pads have been created and cut to grade and compaction test completed. | ||
| 08/13/2025 | Partial Pass | 08/13/25, Slope and grade match the required depth and slope on the 2 loading dock ares on building A west side. Continue with the AB installation at 6" and when compaction is being completed schedule with PDSD to be on site during compaction testing. | ||
| 09/10/2025 | Partial Pass | Parking area and drive line on the West side of building 2: sub-grade is good, okay for AB. North and center not ready. | ||
| 09/11/2025 | Partial Pass | Sub-grade North of building 2 and between buildings 1 & 2 is sloped and compacted per plans with proper depths; ready for AB. |