Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar
Permit Number - DP21-0316
Inspection Description - SITE - Sign Footer/Setback/Excavation Layout/Rebar
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | 3 light pole basses looked at 2 are good, 3rd one on the northwest side has a short ground wire and dirt touching cage. | |
| 07/14/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Canceled | ||
| 07/22/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Canceled | ||
| 07/28/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Not Ready | ||
| 08/07/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | contractor called in the wrong inspections contractor should’ve called in stormwater installation. So I inspected the 18 inch stormwater HDPE on the north east corner of the property and The manhole on the south east side floor only | |
| 09/04/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | 5 light poles on the east side of building 1. Good to pour. | |
| 09/23/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Not Ready | Contractors going to reschedule for tomorrow | |
| 09/24/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | Contractors good to pour the foundation for the monument sign on the southwest corner. Suntech is on site to take cylinders for the foundation. | |
| 09/25/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | Contractor is good to pour the footing for the monument sign on the north west corner of the project | |
| 10/16/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | Contractors good to pour for the monument pier on the south west side | |
| 10/20/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | Okay to pour monument sign concrete | |
| 10/22/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | Okay to pour north monument sign column. | |
| 10/24/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | Okay to pour North Monument wall | |
| 10/30/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | Contractors good pour the foundations for the polls one on the southwest side and one on the south side in between the two buildings |