Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP21-0316
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 08/18/2025 | ENGR Grading Final | Passed | Grading is for the east building and the 2 flat dock areas, both have met compaction and grade hubs are in. | |
| 08/20/2025 | ENGR Grading Final | Partial Pass | Grading compaction testing passed on the 3 north areas on building 2. The 2 south areas need to be re-compacted and tested. | |
| 08/27/2025 | ENGR Grading Final | Partial Pass | The last 2 dock loading areas on building 2 have passed compaction. | |
| 09/16/2025 | ENGR Grading Final | Passed | AB placement, North and West sides of building 2: compaction is good, elevations are good; okay to pave from E Commerce Center Pl to NE corner of building 2. | |
| 09/17/2025 | ENGR Grading Final | Partial Pass | Paving inspection for AB between buildings 1 & 2: elevations, depth, and compaction is good, okay to pave between buildings. |