Inspection Status: Re-inspection required
Inspection History: For trash and recycling enclosures
Permit Number - DP21-0316
Inspection Description - For trash and recycling enclosures
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | For trash and recycling enclosures | Re-inspection required | 05/08/25, Do not pour until rebar has been set to plan spec. 1-1/2" needed from outside of wall to face of #5 bar. This also includes the ramp walls. | |
| 05/14/2025 | For trash and recycling enclosures | Partial Pass | Okay to pour walls. inspection required when walls are stood. | |
| 05/30/2025 | For trash and recycling enclosures | Partial Pass | 05/30/25, 2 trash enclosure's between the 2 buildings, south enclosure needs to have dirt removed in corners and I need pictures on the north one. Last warning, do not schedule inspections for the same day of a pour. | |
| 06/09/2025 | For trash and recycling enclosures | Partial Pass | 06/06/25, bollards are set at 10'-6" and the wall will now be at 1'-6" spacing, pour as is. | |
| 06/11/2025 | For trash and recycling enclosures | Re-inspection required | 06/11/25, DO NOT POIR THESE FOOTINGS. 3" clearance needed between ground and rebar. Footing rebar has a set amount of rebar needed exposed to each side of wall, snakes are not allowed. | |
| 06/13/2025 | For trash and recycling enclosures | Partial Pass | Building 2: 4 trash enclosure footings are okay to pour. Remaining (all) ramp wall footings are okay to pour. | |
| 08/27/2025 | For trash and recycling enclosures | Partial Pass | 08/17/25, refuse enclosure pads have passed compaction and rebar is within tolerance | |
| 09/04/2025 | For trash and recycling enclosures | Partial Pass | 09/04/25, walls for last enclosure pass. | |
| 09/10/2025 | For trash and recycling enclosures | Partial Pass | Footing for Northern most enclosure on Building 1 is correct and good to pour. | |
| 09/25/2025 | For trash and recycling enclosures | Partial Pass | Contractors good to pour the floor for the trash enclosure. Per Josh Garcia’s instruction the rebar is laid out at 24 inch centers using number four bars. | |
| 11/26/2025 | For trash and recycling enclosures | Re-inspection required | Contractor could not make the walk-through. So we’re going to reschedule for another time. |