Inspection History Details
Inspection Status: Passed
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2026 | Passed | |||
| 08/11/2025 | Failed | This inspection was for refuse enclosure. DO NOT POUR… Recall when ready. Approach must have a 12 x 12 #4 rebar mat as per city of Tucson detail. |
||
| 09/05/2025 | Partial Pass | good to,pour ada ramps on east side of building 2 | ||
| 09/16/2025 | Partial Pass | east side of building one: sidewalk forms are accurate to plans, slopes are good. OK to pour. | ||
| 09/30/2025 | Partial Pass | Contractors good to pour sidewalk the north in building two 150 lineal feet by 6 foot | ||
| 10/08/2025 | Partial Pass | contractor can pour the sidewalk in front of building one 10 yards. The sidewalk behind the trash enclosure needs to get into compliance contractor needs to rework that area. I’ve had the contractor to reinstall a lot of the wattles on the west side and the north side of the project. | ||
| 10/08/2025 | Partial Pass | contractor can pour the sidewalk in front of building one 10 yards. The sidewalk behind the trash enclosure needs to get into compliance contractor needs to rework that area. I’ve had the contractor to reinstall a lot of the wattles on the west side and the north side of the project. | ||
| 11/26/2025 | Re-inspection required | Contractor could not make the walk-through. So we’re going to reschedule for another time. |