Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - DP21-0316
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2025 | ENGR - Drainage Structures | Partial Pass | 07/01/25, 4 structures on the east side of the west building have all, been placed correctly | |
| 07/10/2025 | ENGR - Drainage Structures | Partial Pass | Single precast catch basin at the south end of the site, in the middle, is placed according to plans and drain pipe connection and slope is good. Okay to backfill. | |
| 07/16/2025 | ENGR - Drainage Structures | Partial Pass | 07/17/25, two manhole drainage structures on the west side of the property are good to backfill. Manhole drainage structures using the PAG 301 on the north side between the buildings is good to pour. Drainage pipe on the north side of building 1 is good or backfill. Drainage pipe on the southeast side of the project going into the basin is good to backfill. |
|
| 07/22/2025 | ENGR - Drainage Structures | Partial Pass | 07/22/25, backfill two drainage structures on the east side of building 1 and the 1 on the north side between the two buildings. Also good to backfill the one in front of the office and the one at the south end of building 2. | |
| 07/29/2025 | ENGR - Drainage Structures | Partial Pass | 07/29/25, Drainage pipe on the southeast side of the project going into the basin is good to backfill. | |
| 07/31/2025 | ENGR - Drainage Structures | Partial Pass | 07/30/25, Drainage structure between blds 1 and 2 is good to pour. | |
| 08/07/2025 | ENGR - Drainage Structures | Partial Pass | 08/07/25, Drainage structure on the southeast side of building 1 is good to pour. | |
| 09/05/2025 | ENGR - Drainage Structures | Partial Pass | Partial pass on bedding for box culvert | |
| 11/03/2025 | ENGR - Drainage Structures | Partial Pass | Contractor can pour the footer for the head wall on the east end of the building 180’ x 23’ wings using number five bars doubled 1 foot center | |
| 11/05/2025 | ENGR - Drainage Structures | Not Ready | contractor still has to form up the walls for the retaining walls. They’re not ready yet in process. Also need to dial into the box culvert and lay out the number five bars on the box culvert. | |
| 11/06/2025 | ENGR - Drainage Structures | Partial Pass | contractors forming up the head walls and wing walls on the east end of the project. I was there at 8 o’clock this morning to inspect the dowels on the box. Culvert was good. I had to come back at 12 to reinspect the head walls so they could pour at 1 PM. Contractor was not completed forming the walls until 1:30 PM. Concrete truck shows up at 12:30 PM. Did not start pouring the walls until 1:45 PM. | |
| 11/13/2025 | ENGR - Drainage Structures | Passed | contractors good to pour the head wall located the south east corner of the west building. |