Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP21-0302
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
01/02/2024 | ENGR Engineering Final | Partial Pass | The contractor needs to complete the planning of the plants. Hydro seeding the areas. It needs to be hydroseeding and plays the rocks at the curb cut outs. | |
01/02/2024 | ENGR Engineering Final | Partial Pass | The contractor needs to complete the planning of the plants. Hydro seeding the areas. It needs to be hydroseeding and plays the rocks at the curb cut outs. | |
01/11/2024 | ENGR Engineering Final | Passed | ||
01/25/2024 | ENGR Engineering Final | Passed |