Inspection History Details
Inspection Status: Re-inspection required
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/29/2024 | ENGR - Drainage Structures | Re-inspection required | Trash enclosure shall be installed per department of transportation standard details. Scott at 602-329-1501. Please make necessary corrections and schedule inspections from development package permit as required. Consult with site engineer to address plan review issues and provide City approved site drawings for next inspection. |
|
| 03/05/2024 | ENGR - Drainage Structures | Partial Pass | trash enclosure footing. Be sure to allow space for Bollard footings and schedule inspections from your development package permit. | |
| 03/06/2024 | ENGR - Drainage Structures | Re-inspection required | Bollards are required to be a minimum of 4 inch standard pipe size. Secure bollards in place with 4 feet above finished floor and 10 feet required between side bollards, face-to-face. Reschedule for inspection when ready. | |
| 03/12/2024 | ENGR - Drainage Structures | Partial Pass | laying rebar for apron and floor, checked width, height, etc of enclosure. no problems at t this time. | |
| 03/21/2024 | ENGR - Drainage Structures | Partial Pass | gate missing | |
| 04/04/2024 | ENGR - Drainage Structures | Not Ready | Trash enclosure has not been completed | |
| 04/09/2024 | ENGR - Drainage Structures | Passed |