Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP21-0299
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 02/23/2023 | ENGR Engineering Final | Not Ready | Duff with WE O’Neill | |
| 03/03/2023 | ENGR Engineering Final | Not Ready | The contractor is still working on this project is not ready for this inspection to be either partially approved for fully approved. They will be working on raising the manhole covers to finish pavement grades. They will be working on installing the handicap access signs for the parking spaces, they will be working on General cleanup of the site and removal of us excess material before this inspection is rescheduled for a final CofOor rescheduled for a temporary Cof0 | |
| 03/13/2023 | ENGR Engineering Final | Complete (Recurring) | Contractor needs to complete the valley gutter in the back. The handicap parking is noncompliance | |
| 03/22/2023 | ENGR Engineering Final | Partial Pass | inspector has no issues it would prevent a temporary certificate of occupancy. plans currently in review, water harvesting area is not as specified. Trees have not been Staked |
|
| 03/22/2023 | ENGR Engineering Final | Partial Pass | inspector has no issues that would prevent a temporary certificate of occupancy. Plans currently in review. WH 1 is not installed per plan specifications; is only 2 inches below Inlets. trees have not been staked and appear to be undersized. | |
| 03/23/2023 | ENGR Engineering Final | Partial Pass | ||
| 03/23/2023 | ENGR Engineering Final | Partial Pass | Duff with O’Neill. Engineering has no issues. that would prevent a temporary certificate of occupancy. plans are under review, provide long-term bicycle parking, water harvesting and staking as shown. |
|
| 03/30/2023 | ENGR Engineering Final | Passed | ||
| 03/30/2023 | ENGR Engineering Final | Passed |