Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP21-0299
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 02/23/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 02/23/2023 | PDSD Site/Engineering Division - Landscaping | Re-inspection required | assure trees have been installed per plan, specifications and staked accordingly. | |
| 03/03/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | The contractor is still working on this project is not ready for this inspection to be either partially approved for fully approved. They will be working on raising the manhole covers to finish pavement grades. They will be working on installing the handicap access signs for the parking spaces, they will be working on General cleanup of the site and removal of us excess material before this inspection is rescheduled for a final CofOor rescheduled for a temporary Cof0 | |
| 03/03/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | The contractor is still working on this project is not ready for this inspection to be either partially approved for fully approved. They will be working on raising the manhole covers to finish pavement grades. They will be working on installing the handicap access signs for the parking spaces, they will be working on General cleanup of the site and removal of us excess material before this inspection is rescheduled for a final CofOor rescheduled for a temporary Cof0 | |
| 03/13/2023 | PDSD Site/Engineering Division - Landscaping | Complete (Recurring) | The landscaping in the front needs to be deeper so the water can run away from the asphalt and doesn’t have a reverse slope on it | |
| 03/22/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | plans currently in review, water harvesting area is not as specified, as it is only 2 inches lower than inlet Trees have not been Staked |
|
| 03/22/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 03/23/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | stake trees as specified | |
| 03/30/2023 | PDSD Site/Engineering Division - Landscaping | Passed |