Permit: DP21-0299

Parcel: 112054070


Addresses:

2960 N CAMPBELL AV


Inspection Status: Not Ready

Inspection History: PDSD Site/Engineering Division - Landscaping

Permit Number - DP21-0299

Inspection Description - PDSD Site/Engineering Division - Landscaping

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping Not Ready
10/27/2022 PDSD Site/Engineering Division - Landscaping Not Ready
02/23/2023 PDSD Site/Engineering Division - Landscaping Not Ready
02/23/2023 PDSD Site/Engineering Division - Landscaping Re-inspection required assure trees have been installed per plan, specifications and staked accordingly.
03/03/2023 PDSD Site/Engineering Division - Landscaping Not Ready The contractor is still working on this project is not ready for this inspection to be either partially approved for fully approved. They will be working on raising the manhole covers to finish pavement grades. They will be working on installing the handicap access signs for the parking spaces, they will be working on General cleanup of the site and removal of us excess material before this inspection is rescheduled for a final CofOor rescheduled for a temporary Cof0
03/03/2023 PDSD Site/Engineering Division - Landscaping Not Ready The contractor is still working on this project is not ready for this inspection to be either partially approved for fully approved. They will be working on raising the manhole covers to finish pavement grades. They will be working on installing the handicap access signs for the parking spaces, they will be working on General cleanup of the site and removal of us excess material before this inspection is rescheduled for a final CofOor rescheduled for a temporary Cof0
03/13/2023 PDSD Site/Engineering Division - Landscaping Complete (Recurring) The landscaping in the front needs to be deeper so the water can run away from the asphalt and doesn’t have a reverse slope on it
03/22/2023 PDSD Site/Engineering Division - Landscaping Not Ready plans currently in review, water harvesting area is not as specified, as it is only 2 inches lower than inlet
Trees have not been Staked
03/22/2023 PDSD Site/Engineering Division - Landscaping Passed
03/23/2023 PDSD Site/Engineering Division - Landscaping Not Ready stake trees as specified
03/30/2023 PDSD Site/Engineering Division - Landscaping Passed