Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 07/25/2023 | ENGR Engineering Final | Partial Pass | engineering has no issues that would prevent a temporary certificate of occupancy for public use. Complete grading and landscaping work at water harvesting areas and roof drain terminations. Provide a resolution to exit pathways. |
|
| 07/25/2023 | ENGR Engineering Final | Partial Pass | neering has no issues that would prevent a temporary certificate of occupancy for public use. Complete grading and landscaping work at water harvesting areas and roof drain terminations. Provide a resolution to exit pathways. |
|
| 08/11/2023 | ENGR Engineering Final | Partial Pass | ||
| 08/15/2023 | ENGR Engineering Final | Not Ready | Complete remaining work and cleanup, including rainwater downspout connection to scupper, trash, enclosure, door, pin holes. etc | |
| 08/16/2023 | ENGR Engineering Final | Passed | ||
| 08/16/2023 | ENGR Engineering Final | Passed | note, plan revision pending |