Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - NPPO
Permit Number - DP21-0298
Inspection Description - PDSD Site/Engineering Division - NPPO
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | PDSD Site/Engineering Division - NPPO | Not Ready | ||
06/21/2023 | PDSD Site/Engineering Division - NPPO | Not Ready | Randy at331-238-2253. Project appears to be new building at existing storage facility. Grading in progress. Work within the right of way in progress. No attachments found. contact not answering phone. Please schedule preconstruction inspection and all other required inspections for this permit. | |
07/10/2023 | PDSD Site/Engineering Division - NPPO | Partial Pass | Contractor needs to finish the landscaping and some of the grading they have for landscaping and paint in the handicap parking area and signs need to be installed | |
07/12/2023 | PDSD Site/Engineering Division - NPPO | Not Ready | Reschedule | |
07/25/2023 | PDSD Site/Engineering Division - NPPO | Not Ready | Contractor needs to install riprap from the gutter of the roof drain to the valley gutter on the south end of the building. Needs railing on the back door of the building. Needs tree staking on the north end of the building. | |
08/09/2023 | PDSD Site/Engineering Division - NPPO | Partial Pass | Contractors pouring sidewalk on the south end of the building. There is no NPPO on this project. Contractor also installed sidewalk scuppers along the south end of the building and adding a new ramp on the north west side of the main building. | |
08/11/2023 | PDSD Site/Engineering Division - NPPO | Passed |