Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 10/18/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Trackout protection in place. Concrete containment in place. Material piles are contained on site.
4659 E NORTH ST
|
| 10/18/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Track out protection
4656 E GRANT RD |
| 09/29/2022 |
SITE - Stormwater Setup and Controls |
RCHANDLER |
Not ready for Inspection |
Entered by NGARCIA3 - Not ready.
4656 E GRANT RD |
| 03/03/2023 |
SITE - Stormwater Setup and Controls |
|
Passed |
THIS SITE IS UNDER CONSTRUCTION WITH MINOR TRACKOUT |
| 11/15/2022 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Partially approved |