Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP21-0293

Parcel: 12504005A


Addresses:

2424 E SPEEDWAY BL

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
01/30/2024 ENGR Engineering Final Not Ready
02/22/2024 ENGR Engineering Final Partial Pass need to confirm with cot building/zoning concerning ADA ACESS TO BUILDING ENTRANCE AS WELL AS FROM SIDEWALK. good for TCO4.
02/23/2024 ENGR Engineering Final Partial Pass Stephen Collin’s is working on conformation regarding sidewalk areas.
02/28/2024 ENGR Engineering Final Passed ADA access ramp to main entrance (north side by arch) is ADA non-compliant. However, this project did not require/trigger changes to entrance access ramp.