Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 03/06/2023 | ENGR Engineering Final | Not Ready | The following items will still need to be addressed prior to closing this permit for the final. 1) Complete all work is shown on the approved plans or revise drawings for this site. 2) Redo the handicap parking signs for the The two handicap parking spaces, design bottoms on the post will need to be heightened, so that they are at least 7 feet above the existing grade currently in approximately 5 feet. 3) Install the long-term bicycle parking structure and shown on the approved plans west of the building south of the parking lot. |
|
| 03/22/2024 | ENGR Engineering Final | Passed | ||
| 03/26/2024 | ENGR Engineering Final | Passed |