Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP21-0284
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Setup and Controls | Not Ready | ||
04/03/2024 | SITE - Stormwater Setup and Controls | Passed | ||
10/18/2023 | SITE - Stormwater Setup and Controls | Not Ready | The stormwater waddles need to be staked. There is no track out. Rock on site needs to be installed. |