Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 05/18/2022 | ENGR Grading Final | MHERNANDEZ | Not Applicable | Entered by VVERA1 - NA |
| 07/17/2023 | ENGR Grading Final | Not Ready | I call Nick Ferraris he informed me that DAVID ROBERTS INSPECTION THE SITE THIS MORNING . SEE DAVID NOTES. |
|
| 08/28/2023 | ENGR Grading Final | Partial Pass | Contractors good to pour the floor for the trash enclosure | |
| 08/29/2023 | ENGR Grading Final | Not Ready | Contractor called me and canceled inspections for today on all inspections | |
| 08/29/2023 | ENGR Grading Final | Not Ready | Contractor called me and canceled inspections for today on all inspections | |
| 09/20/2023 | ENGR Grading Final | Not Ready | The sidewalk coming in from off the street is NONCOMPLIANT if the contractor is going to leave it at 7.7% he needs railing on both sides. | |
| 09/20/2023 | ENGR Grading Final | Not Ready | The sidewalk coming in from off the street is NONCOMPLIANT if the contractor is going to leave it at 7.7% he needs railing on both sides. | |
| 09/21/2023 | ENGR Grading Final | Partial Pass | ||
| 09/21/2023 | ENGR Grading Final | Partial Pass | Inform the contractor that the sidewalk coming from the street to the building is NONCOMPLIANT because it reads 7.7% if the contractor is going to leave it that way he needs to put railing on both sides of the sidewalk. | |
| 09/21/2023 | ENGR Grading Final | Partial Pass | Inform the contractor that the sidewalk coming from the street to the building is NONCOMPLIANT because it reads 7.7% if the contractor is going to leave it that way he needs to put railing on both sides of the sidewalk. | |
| 10/09/2023 | ENGR Grading Final | Partial Pass | Contractor has not completed the basins or the water harvesting yet | |
| 10/13/2023 | ENGR Grading Final | Partial Pass | ||
| 10/13/2023 | ENGR Grading Final | Partial Pass | 24’ of handicap railing is needed for sidewalk at SE corner of building headed South toward Old Vail Rd. | |
| 10/27/2023 | ENGR Grading Final | Partial Pass | ||
| 10/27/2023 | ENGR Grading Final | Partial Pass | Parking lot asphalt, striping. and handi-cap parking spaces are completed. North side parking area is completed and parking stops are in approved plan locations. |
|
| 10/27/2023 | ENGR Grading Final | Partial Pass | Parking lot asphalt, striping. and handi-cap parking spaces are completed. North side parking area is completed and parking stops are in approved plan locations. |
|
| 11/16/2023 | ENGR Grading Final | Partial Pass | Contractor still needs to hydroseed and to put filter fabric underneath the riprap in the parking area steak the plants | |
| 11/16/2023 | ENGR Grading Final | Partial Pass | Contractor still needs to hydroseed and to put filter fabric underneath the riprap in the parking area steak the plants | |
| 11/16/2023 | ENGR Grading Final | Passed | ||
| 11/27/2023 | ENGR Grading Final | Passed | ||
| 11/27/2023 | ENGR Grading Final | Passed |