Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 11/16/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor still needs to hydroseed and to put filter fabric underneath the riprap in the parking area steak the plants |
| 11/16/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor still needs to hydroseed and to put filter fabric underneath the riprap in the parking area steak the plants |
| 11/27/2023 |
ENGR Engineering Final
|
|
Partial Pass |
landscaping the hydroseed that the contractor used it’s not the same as what’s on the plans. Contractor needs to call Dave Roberts to verify the HYDROSEEDING |
| 11/27/2023 |
ENGR Engineering Final
|
|
Partial Pass |
landscaping the hydroseed that the contractor used it’s not the same as what’s on the plans. Contractor needs to call Dave Roberts to verify the HYDROSEEDING |
| 12/01/2023 |
ENGR Engineering Final
|
|
Passed |
|
| 12/01/2023 |
ENGR Engineering Final
|
|
Passed |
|