Permit: DP21-0219

Parcel: 10610005D


Addresses:

2020 W PRINCE RD

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/20/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Drain assembly in loading dock, Per engineer detail CSK - 02. Chris and Jeff with Les construction
10/20/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Drain assembly in loading dock, Per engineer detail CSK - 02. Chris and Jeff with Les construction
10/04/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Bottom section of trough drain at loading dock per engineers instructions. Jeff with Lang construction.
09/29/2022 ENGR Grading Final BBENEDON Not ready for Inspection Entered by NGARCIA3 - Not ready. Inspection canceled by Geoff due to rain event.
09/09/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. RCP at loading dock as shown. Chuck with Magnum.
09/08/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Jeff Lang, please use Grading intermediate inspections for stormwater piping inspections. RCP at loading dock.
09/07/2022 ENGR Grading Final BBENEDON Partial Approval Entered by VVERA1 - Partially approved. Eight catch basins as shown, along west side of new building structure. Chuck with Magnum construction on site.
03/01/2022 ENGR Grading Final DROBERTS Partial Approval Entered by NGARCIA3 - PARTIAL, CREWS HAVE BEEN WORING ON CLEARING OF THE SITE AND CONSTRUCTING CURBS AROUND THE WEST PARKING AREA.
05/16/2023 ENGR Grading Final Passed
10/28/2022 ENGR Grading Final Partial Pass
11/22/2022 ENGR Grading Final Complete (Recurring) Loading dock Area,partial approval