Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 08/17/2022 |
ENGR Grading Final |
MHERNANDEZ |
Continued |
Entered by VVERA1 - CN CONTRACTOR IS GRADING THE PARKING LOT .INFORMED THE CONTRACTOR TO CALL IN INSPECTION EVERY TWO WEEKS. |
| 08/16/2022 |
ENGR Grading Final |
MHERNANDEZ |
Continued |
Entered by NGARCIA3 - CN /GRADING THE PARKING LOT. |
| 08/09/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Pima paving on site. Contractor requested to schedule inspections biweekly. Track out noted contractor requested to keep the streets clean and provide protection as needed.
|
| 07/06/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Project has started. Precon has been approved. No contact information. Contractor requested to schedule inspections biweekly.
|
| 08/31/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Grading and curbs |
| 08/03/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Grading activities. Thornhill construction
|
| 07/15/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Site has been rough graded and staked. Building remains in place.
|
| 07/07/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Building construction in progress no site activity at this time.
|
| 06/13/2023 |
ENGR Grading Final |
|
Complete (Recurring) |
On-“site meeting with Rick. Correct excessive slope at accessible parking spaces and pathways. Install signage. Provide minimum 6 inches As shown for landscape areas and water retention basins. Schedule inspections for trash, enclosure, footings, and pre-grout when ready. |
| 07/12/2023 |
ENGR Grading Final |
|
Partial Pass |
|
| 07/19/2023 |
ENGR Grading Final |
|
Not Ready |
Vertical rebar to be installed at 32 inches max |
| 07/20/2023 |
ENGR Grading Final |
|
Partial Pass |
Trash enclosure footings |
| 07/25/2023 |
ENGR Grading Final |
|
Partial Pass |
Grading |
| 10/11/2023 |
ENGR Grading Final |
|
Not Ready |
no plans on-site. two handicap spots not to code, no van access area. exterior water and electrical outlet trip hazards in exterior seating area. |
| 10/11/2023 |
ENGR Grading Final |
|
Not Ready |
no plans on-site. two handicap spots not to code, no van access area. exterior water and electrical outlet trip hazards in exterior seating area. |
| 10/11/2023 |
ENGR Grading Final |
|
Not Ready |
no plans on-site. two handicap spots not to code, no van access area. exterior water and electrical outlet trip hazards in exterior seating area. broken concrete curb |
| 10/13/2023 |
ENGR Grading Final |
|
Passed |
|
| 10/13/2023 |
ENGR Grading Final |
|
Passed |
|
| 10/13/2023 |
ENGR Grading Final |
|
Passed |
|