Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 07/20/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Trash enclosure footing, Rick/ Thornhill at bandit’s |
| 07/25/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
provide clean outs for inspection purposes on lifts greater than 4 feet, |
| 07/25/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Rick/ Thornhill, provide clean outs for inspection purposes on lifts greater than 4 feet |
| 07/27/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
pre-grout |
| 08/03/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
add “doggie blocks” and finish rebar ties. please send pix to 520 283 2866 Stephen collins |
| 08/10/2023 |
ENGR - Drainage Structures |
|
Not Ready |
solid waste container enclosure floor reinforcement not in-place. walls and bollards present. |
| 08/10/2023 |
ENGR - Drainage Structures |
|
Not Ready |
solid waste enclosure floor reinforcement not complete at time of inspection. walls and bollards complete. |
| 10/17/2023 |
ENGR - Drainage Structures |
|
Passed |
|