Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: ENGR - Drainage Structures
Permit Number - DP21-0214
Inspection Description - ENGR - Drainage Structures
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/24/2023 | ENGR - Drainage Structures | Complete (Recurring) | Contractor’s forming for three catch basins there was a change order on the layout for the rebar from 18 inches to 1 foot formed look good at this time | |
03/28/2023 | ENGR - Drainage Structures | Not Ready | No concerns at this time | |
04/04/2023 | ENGR - Drainage Structures | Partial Pass | Met with a contractor from Harvey construction to look over the site and checked retention detention basins, which they’re starting to cut, Basins will be scheduled for latter part of this week or next week for a pre-basin inspection prior to the installation of rock riprap | |
05/02/2023 | ENGR - Drainage Structures | Complete (Recurring) | One more catch basins to finish on the southwest side | |
05/22/2023 | ENGR - Drainage Structures | Passed |