Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 03/06/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Landscapes not completed |
| 03/06/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Landscapes not completed |
| 03/08/2023 |
ENGR Engineering Final
|
|
Complete (Recurring) |
Contractor needs to remove the fence and install riprap filter fabric in front of the building and remove all construction equipment |
| 03/08/2023 |
ENGR Engineering Final
|
|
Complete (Recurring) |
Contractor needs to remove the fence finish the landscaping install filter fabric on the west side weather is riprap and remove all construction equipment |
| 03/13/2023 |
ENGR Engineering Final
|
|
Partial Pass |
The riprap in front of the building needs to be looked at by Dave Roberts |
| 03/13/2023 |
ENGR Engineering Final
|
|
Partial Pass |
There is some riprap on the front of the building that needs to be looked at by Dave Roberts |
| 03/16/2023 |
ENGR Engineering Final
|
|
Complete (Recurring) |
Pending on the completion of the landscape for water harvesting on the north end of the building. The sign on the front of the building has not been completed yet contractor still working on it |
| 03/16/2023 |
ENGR Engineering Final
|
|
Passed |
|
| 03/21/2023 |
ENGR Engineering Final
|
|
Passed |
N/A |