Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
|
| 10/27/2022 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
|
| 03/06/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Complete (Recurring) |
Contractor installed ripwrap without filter fabric underneath needs to remove the rip wrap and install the filter fabric |
| 03/06/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Complete (Recurring) |
There is no filter fabric underneath the riprap |
| 03/08/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Complete (Recurring) |
Contractors not completed the DG on the west side of building . Need to put filter fabric underneath the riprap on the west side of building where there is riprap |
| 03/08/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Complete (Recurring) |
Landscape is still not completed contract I need to put some filter fabric underneath the riprap front of the building |
| 03/13/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Partial Pass |
Rip wreck in front of the building needs to be looked at my Dave Roberts |
| 03/13/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Partial Pass |
The riprap in the front of the building needs to be looked at by Dave Roberts |
| 03/16/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Partial Pass |
Contractor needs to complete the Water harvesting on the north end of the building off of 22nd St. |
| 03/16/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Passed |
|
| 03/21/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Passed |
N/A |