Inspection Status: Not Ready
Inspection History: SITE - Stormwater Final Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Final Inspection |
|
Not Ready |
|
| 09/25/2023 |
SITE - Stormwater Final Inspection |
|
Complete (Recurring) |
Contractor needs to finish the riprap |
| 10/11/2023 |
SITE - Stormwater Final Inspection |
|
Complete (Recurring) |
SE end of rear parking lot has two areas leading to rip rap with no further drainage capabilities to allow flow of water to drain from parking lot and ponding appears to be an issue. |
| 10/20/2023 |
SITE - Stormwater Final Inspection |
|
Passed |
|