Permit: DP21-0193

Parcel: 13705557A

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - DP21-0193

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
09/27/2022 ENGR Engineering Final MHERNANDEZ Continued Entered by NGARCIA3 - CN /HAS NOT STARTED YET.
09/26/2023 ENGR Engineering Final Not Ready Work in progress
10/10/2023 ENGR Engineering Final Not Ready Developed pad no construction started at this time.
10/11/2023 ENGR Engineering Final Partial Pass I walked the site with the Superintendent Dave and went over many areas in the front parking lot handicap spaces that need asphalt patching and leveling for large voids in all (4) designated handicap spaces and one large median curb area to SE front of parking lot that needs asphalt patching and repair.

The handicap space in front of building to the far SE end needs to be repainted.

Dumpster to be removed from parking prior to recall of inspection.

Various locations on curb areas are to be patched and repaired prior to recall of inspection.
10/20/2023 ENGR Engineering Final Partial Pass TC of O level 4 is granted for occupancy of building pending remaining landscape items to be completed.

General clean up is needed for sidewalk from West parking lot to the Santa Cruz pavement walkway.

Bollards on West side of parking lot need missing caps and (2) need to be reset in concrete they are not secure and are leaning.

Tree stakes need to be completed and dead trees need to be replaced.

SE parking lot drainage areas will need to be dug down to a depth of 9” below curb cut inlet and landscaping adjusted to achieve storm water containment from parking lot runoff.
11/21/2023 ENGR Engineering Final Passed