Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP21-0193
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
09/25/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Contractor still working on putting in plants and riprap | |
09/26/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Work in progress | |
10/09/2023 | PDSD Site/Engineering Division - Landscaping | Passed | 1) Good count on plants, landscape looks great. | |
10/11/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Rip Rap is completed all hand placed with filter fabric installed in all rip rap areas, all trees do not have stake poles will need to verify prior to recall of inspection. All trees, plants, and shrubs are completed and are well irrigated. |
|
10/13/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Walked site with Superintendent Henry regarding the West reaper parking lot drainage issue regarding the depression needed per plan to retain drainage and he will have grading and landscape contractors review on site and adjust prior to recall of inspection. | |
10/20/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | TC of O level 4 is granted for occupancy of building pending remaining landscape items to be completed. General clean up is needed for sidewalk from West parking lot to the Santa Cruz pavement walkway. Bollards on West side of parking lot need missing caps and (2) need to be reset in concrete they are not secure and are leaning. Tree stakes need to be completed and dead trees need to be replaced. SE parking lot drainage areas will need to be dug down to a depth of 9” below curb cut inlet and landscaping adjusted to achieve storm water containment from parking lot runoff. |
|
11/21/2023 | PDSD Site/Engineering Division - Landscaping | Passed |