Permit Number - DP21-0183

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
09/29/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. No activity on site at this time, gate is locked. Ongoing progress is evident. Stormwater controls are in place as well as concrete containment. Have been unable to contact superintendent for this project. 635 W Roger Rd
09/16/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. No activity on site at this time, gate is locked.
10/06/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Contractor on site at this time. Kevin with G and J construction. At 520-490-1274. Please schedule inspections 09150, 09152, and 09154, coordinate inspection when superintendent is on site. Please provide Message when scheduling inspections 651 W ROGER RD
10/06/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued 721 W ROGER RD
10/06/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Kevin with G and J construction. At 520-490-1274. Please schedule inspections 09150, 09152, 09154, coordinate inspection when superintendent is on site. Please provide Message when scheduling inspections 635 W ROGER RD
01/26/2024 ENGR Grading Final Partial Pass install sidewalk scupper at East portion of new buildings, correct grade around sidewalk scuppers and at grate attachment to Stormwater piping. remove construction debris. Install accessible signage. complete landscaping and basin for final approval.
04/12/2023 ENGR Grading Final Complete (Recurring) grading, curbs and sidewalks in progress. Construction debris on site temporary fencing still in place. Kevin with G and J
05/14/2024 ENGR Grading Final Passed
06/15/2023 ENGR Grading Final Complete (Recurring) Courtesy, unscheduled inspection. Final grading for basin underway at this time. Ensure all water harvesting areas are installed as shown.