Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: NPPO Pre-Construction
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/2025 |
NPPO Pre-Construction |
|
Passed |
Per on-site discussion all non viable trees scheduled for transplant will be replaced with 24 inch box (total of 11 native trees). After initial grading, the monitoring of the nppo inspections will be completed on DP21-0174 (final placement of the the (11) 24" box native trees). |