Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 01/13/2023 |
SITE - Stormwater Setup and Controls |
|
Passed |
N/A |
| 11/15/2022 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
No changes at this time |
| 11/18/2022 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Stormwater controls in place. Continued |
| 11/30/2022 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Set in the steel for the HD pipe wing walls |
| 12/22/2022 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
The head walls for the drainage are made out of block the one on the north west side and one on the north east side |