Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP21-0171
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2024 | ENGR Engineering Final | Not Ready | The short term bicycle parking has not been installed at this time and verification of some of the grades on the interior of the site will be made tomorrow prior to putting this status into a partial pass | |
09/27/2024 | ENGR Engineering Final | Partial Pass | Ok for a TCO of the Building but ADA Parking Spaces and Access Aisles are not fully Compliant at this time | |
10/11/2023 | ENGR Engineering Final | Not Ready | Will review with Dave Roberts | |
10/28/2024 | ENGR Engineering Final | Passed |