Permit: DP21-0167

Parcel: 120052720


Addresses:

840 W IRVINGTON RD


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP21-0167

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
09/16/2022 ENGR Grading Final BBENEDON Approved Entered by VVERA1 - Approved
09/06/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - LOOKED AT THE LANDSCAPE ITEMS AND THE TRASH ENCLOSURE. 1) THE ISLANDS ARE NOT DEEP ENOUGH, THEY ARE AT THE SAME ELEVATION AS THE CURB OPENING, ADVISED THE CONTRACTOR THAT THERE NEEDS TO BE 6-9 INCHES OF FREEBOARD SPACE BELOW THE LOWEST POINT OF THE INLET. 2) THE TRASH ENCLOSURE IS TOO SMALL AND WILL NEED TO BE REDONE UNLESS ENVIRONMENTAL SERVICES AGREES IT IS ACCEPTABLE. I SHOW LARRY MCMANUS OF MCMANUS CONSTRUCTION THAT THE PLANS WERE APPROVED WRONG WITH THE WRONG DETAIL AND MAY NEED TO BE REDONE. 3) CREWS ARE WORKING ON PIPE INSTALLATION ON THE NORTH SIDE OF THE SITE, THIS WORK APPEARS TO BE OKAY. I HAVE ADVISED THEM TO CENTER THE PIPE AS THEY BACKFILL IT AND TAKE PHOTOS WHILE DOING THE WORK.
07/06/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN /SOME OF THE SITE AREA
06/03/2022 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - LOOKED ATG THE 12 PIPE INSTALLATION ON THE NORTH SIDE OF THE SITE FROM THE EXISTING SERVICE TO THE NEW LOCATION FOR THE STORMWATER SYSTEM. I CONTACTED PHILLIP WITH ADS PIPE IN PHOENIX AND ASKED OBOUT THE REQUIREMENTS FOR THE TRENCHING OF THE PIPE AND THEBACKFILL REQUIREMENTS. THE CONTRACTOR IS GOING TO USE ABC FOR THE BEDDING MATERIAL AND FOR THE FILL MATERIAL UPTO 1 FOOT ABOVE THE PIPE, THEN THEY WILL BE USING THE NATIVE SOILS FROM THE SITE. THEY WILL TAKE PHOTO'S OF THE INSTALLATION AND THE PLACEMENT OF THE ENGINEERED BACKFILL. ONCE THIS WORK IS COMPLETED AND APPROVED BY MYSELF THEY WILL BE WORKING ON THE NATIVE BACKFILL.
05/24/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN GRADING FOR SIDEWALK .
04/01/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN CONTRACTOR NOT ON SITE NEED TO RESCHEDULE.
11/30/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN GRADING THE PAD FOR THE BUILDING.
09/20/2022 ENGR Grading Final MHERNANDEZ Partial Approval Entered by NGARCIA3 - PARTIAL
09/16/2022 ENGR Grading Final BBENEDON Partial Approval Entered by VVERA1 - Partially approved. Complete previously noted corrections. Provide notice of termination forSWPPP
07/27/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN/ GOOD TO POUR FOR THE FLOOR FOR TRASH BIN.
07/26/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN THE FLOOR FOR THE TRASH BIN IS NO READY FOR INSPECTION.RESCHEDULE FOR THURSDAY.
07/06/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN /THE REBAR LAYOUT IS NONCOMPLIANT .CONTRACTOR WILL TAKE A PHOTO AND SEND IT TO ME AFTER RELAY OUT THE REBAR.
11/09/2022 ENGR Grading Final Passed N/A
11/09/2022 ENGR Grading Final Passed N/A
11/09/2022 ENGR Grading Final Passed N/A