Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/09/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by NGARCIA3 - Approved. Dale with Caldwell construction at349-2738. Enter through Alley north of 7th Street. Food conspiracy expansion to the rear. Contain all materials within the site, schedule inspections biweekly.
418 N 4TH AV
|
| 08/09/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by NGARCIA3 - Approved. Dale with Caldwell construction at349-2738. Enter through Alley north of 7th Street. Food conspiracy expansion to the rear. Contain all materials within the site, schedule inspections biweekly.
412 N 4TH AV |