Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 03/23/2023 |
ENGR Grading Final |
|
Complete (Recurring) |
Contractor install the fence around the whole project. As of today there is no activity on site. |
| 05/18/2023 |
ENGR Grading Final |
|
Complete (Recurring) |
Mister Grady needs to be done on the south east side |
| 05/22/2023 |
ENGR Grading Final |
|
Partial Pass |
This inspection will be scheduled over the next two weeks for various buildings and locations as needed. At this time there is no reason to hold up a Temporary Certificate of Occupancy for any other buildings If the TC of O Is authorized by the building review section. |
| 05/22/2023 |
ENGR Grading Final |
|
Partial Pass |
This inspection will be scheduled over the next two weeks for various buildings and locations as needed. At this time there is no reason to hold up a Temporary Certificate of Occupancy for any other buildings If the TC of O Is authorized by the building review section. |
| 05/22/2023 |
ENGR Grading Final |
|
Partial Pass |
This inspection will be scheduled over the next two weeks for various buildings and locations as needed. At this time there is no reason to hold up a Temporary Certificate of Occupancy for any other buildings If the TC of O Is authorized by the building review section. |
| 05/22/2023 |
ENGR Grading Final |
|
Partial Pass |
This inspection will be scheduled over the next two weeks for various buildings and locations as needed. At this time there is no reason to hold up a Temporary Certificate of Occupancy for any other buildings If the TC of O Is authorized by the building review section. |
| 06/08/2023 |
ENGR Grading Final |
|
Partial Pass |
This site is not ready at this time due to continual construction in fenced off areas |
| 06/12/2023 |
ENGR Grading Final |
|
Complete (Recurring) |
Contractors grading behind the softball fields. Inform the contractor he needed to remove all temporary fence before getting TC OF O. |
| 12/20/2022 |
ENGR Grading Final |
|
Complete (Recurring) |
Contractors not ready for inspection for grading |