Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 06/09/2024 |
ENGR Engineering Final
|
|
Passed |
Improvements per As-Built drawings have been completed. |
| 05/18/2023 |
ENGR Engineering Final
|
|
Complete (Recurring) |
There’s issues with the grady considering the riprap and no filter fabric underneath it |
| 05/22/2023 |
ENGR Engineering Final
|
|
Partial Pass |
This inspection will be scheduled over the next two weeks for various buildings and locations as needed. At this time there is no reason to hold up a Temporary Certificate of Occupancy for any other buildings If the TC of O Is authorized by the building review section. |
| 05/22/2023 |
ENGR Engineering Final
|
|
Partial Pass |
This inspection will be scheduled over the next two weeks for various buildings and locations as needed. At this time there is no reason to hold up a Temporary Certificate of Occupancy for any other buildings If the TC of O Is authorized by the building review section. |