Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 01/23/2025 |
ENGR Engineering Final
|
|
Passed |
All items have been corrected |
| 05/08/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Construction on the lot areas in some of the common areas |
| 05/08/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Ongoing construction in the common areas and in the lot areas |
| 05/16/2024 |
ENGR Engineering Final
|
|
Partial Pass |
There is construction going on on quite a few lots |
| 05/16/2024 |
ENGR Engineering Final
|
|
Partial Pass |
there’s still construction activity“ on quite a few lots |
| 05/22/2024 |
ENGR Engineering Final
|
|
Partial Pass |
contractor has not completed building on the pads |
| 05/22/2024 |
ENGR Engineering Final
|
|
Partial Pass |
contractor has not completed building on the pads |
| 06/10/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Address the missing sidewalk and the damage sidewalk |
| 06/10/2024 |
ENGR Engineering Final
|
|
Passed |
|
| 09/19/2024 |
ENGR Engineering Final
|
|
Not Ready |
|
| 11/19/2024 |
ENGR Engineering Final
|
|
Partial Pass |
|