Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP21-0102
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
05/08/2024 | ENGR Engineering Final | Partial Pass | Construction on the lot areas in some of the common areas | |
05/08/2024 | ENGR Engineering Final | Partial Pass | Ongoing construction in the common areas and in the lot areas | |
05/16/2024 | ENGR Engineering Final | Partial Pass | There is construction going on on quite a few lots | |
05/16/2024 | ENGR Engineering Final | Partial Pass | there’s still construction activity“ on quite a few lots | |
05/22/2024 | ENGR Engineering Final | Partial Pass | contractor has not completed building on the pads | |
05/22/2024 | ENGR Engineering Final | Partial Pass | contractor has not completed building on the pads | |
06/10/2024 | ENGR Engineering Final | Partial Pass | Address the missing sidewalk and the damage sidewalk | |
06/10/2024 | ENGR Engineering Final | Passed | ||
09/19/2024 | ENGR Engineering Final | Not Ready | ||
11/19/2024 | ENGR Engineering Final | Partial Pass |