Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 09/18/2023 |
ENGR Engineering Final
|
|
Not Ready |
under construction |
| 09/18/2023 |
ENGR Engineering Final
|
|
Not Ready |
under construction |
| 10/09/2025 |
ENGR Engineering Final
|
|
Not Ready |
Place rip rap weirs at the ends of the grouted rip rap at the south side of Red Bluff cul-de-sac. Fan them out and end them where it flattens out before the sidewalks. Set Sediment Marker in Basin B-1 per plan. |
| 10/23/2025 |
ENGR Engineering Final
|
|
Passed |
|