Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP21-0060
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 09/18/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | under construction | |
| 09/18/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | under construction | |
| 10/09/2025 | PDSD Site/Engineering Division - Landscaping | Not Ready | Repair leaky Backflow preventer at southside of red Bluff cul-de-sac. Majority of Occotillo are dead in subdivision. Along S Verdin Valley, Red Bluff Cul-de-sac and in B-1 Basin Occotillos need to be replaced. Creosote and Brittle brush need to go into Basin Retention basin at Irvington Road. Repair disturbed area at corner of Wingate and Irvington between retention basin and pathway. |