Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP21-0051
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/16/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
03/14/2022 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - IS NOT READY |
08/16/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by NGARCIA3 - FINAL IS APPROVED |
05/05/2022 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - PARTIAL, COMPLETE THE FOLLOWING: 1) THE BOLLARD INSTALLATION IN THE TRASH ENCLOSURE, GROUT AS NEEDED AROUND THE BASE AND APPLY YELLOW PAINT TO MATCH THE OTHERS. 2) INSTALL THE DRAINAGE SCUPPERS AT THE DOWN DRAINS AS SHOWN ON THE APPROVED PLANS AND AS PREVIOUSLY DISCUSSED DURING A SITE INSPECTION. |
03/14/2022 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - NOT READY AT THIS TIME, SEE NOTES IN THE GRADING INTERMEDIATE INSPECTION 09185 FOR 3/14/2022 |