Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 08/31/2022 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by VVERA1 - Approved. Enclosure slab and bollards. |
| 08/31/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by VVERA1 - Partially approved. Trash enclosure bollards. Mike Epstein |
| 07/15/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Pre-grout. Ben and Zac.
2208 N CAMINO PRINCIPAL |
| 07/15/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Ben with Epstein
2200 N CAMINO PRINCIPAL |
| 07/07/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Trash enclosures one and two, footings. Ben with Epstein
2208 N CAMINO PRINCIPAL |
| 07/07/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Trash enclosures one and two, footings. Ben with Epstein
2200 N CAMINO PRINCIPAL |
| 07/06/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. City of Tucson trash enclosure detail sent to band with Epstein at 83345608.
|
| 10/12/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Accessible walkways pre-slab. Handrails and edge protection required at accessible route, Northwest corner of building at emergency exit.
2200 N Camino Principal, |
| 10/07/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Work within the right of way requires-right of way permit and inspection. Mike with Epstein |
| 09/13/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Curbs along the northern portion of site. No issues with minor discrepancy at water meters.
2208 N CAMINO PRINCIPAL |
| 09/13/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Curbs along the northern portion of site. No issues with minor discrepancy at water meters.
2200 N CAMINO PRINCIPAL |
| 08/29/2022 |
ENGR Grading Final |
MHERNANDEZ |
Continued |
Entered by NGARCIA3 - CN /CHECKING THE SIDEWALK.
2208 N CAMINO PRINCIPAL |
| 08/29/2022 |
ENGR Grading Final |
MHERNANDEZ |
Continued |
Entered by NGARCIA3 - CN /CHECKING THE SIDEWALK.
2200 N CAMINO PRINCIPAL |
| 08/23/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Rough grading
2208 N CAMINO PRINCIPAL |
| 08/23/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Rough grading. Mike with Epstein on site
2200 N CAMINO PRINCIPAL |
| 07/19/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Site grading
2200 N Camino Principal, |
| 04/15/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued |
| 04/12/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Utility work in progress. Construction debris piles on site
2200 N Camino Principal |
| 03/16/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Mike with Epstein. Engineering has no issues with electrical panel protruding into sidewalk.
2200 N Camino Principal |
| 03/01/2022 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by NGARCIA3 - CONTINUED AT THIS TIME. CREWS ARE STILL WORKING MAINLY KN VERTICAL WORK WITHIN THE STRUCTURES.
2208 N CAMINO PRINCIPAL |
| 03/01/2022 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by NGARCIA3 - CONTINUED AT THIS TIME. CREWS ARE STILL WORKING MAINLY KN VERTICAL WORK WITHIN THE STRUCTURES.
2200 N CAMINO PRINCIPAL |
| 12/22/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Mike with Epstein. Schedule inspection for retaining wall with building and engineering. Photo documentation may be excepted
|
| 12/08/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. No site work at this time. Contractor completing building changes. Mike with Epstein |
| 10/01/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Building progress |
| 11/10/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued.Building construction in progress material stock piles on site. Temporary fencing in place. |
| 01/10/2023 |
ENGR Grading Final |
|
Partial Pass |
OK to start landscaping |
| 01/10/2023 |
ENGR Grading Final |
|
Partial Pass |
tco |
| 01/10/2023 |
ENGR Grading Final |
|
Passed |
|
| 01/26/2023 |
ENGR Grading Final |
|
Passed |
|
| 01/26/2023 |
ENGR Grading Final |
|
Passed |
|
| 11/04/2022 |
ENGR Grading Final |
|
Re-inspection required |
MOST WORK ON THIS SITE IS GOING VERTICAL, SITE WORK IS NOT REALLY GONE PAST SIDEWALKS AND CURBS |
| 12/05/2022 |
ENGR Grading Final |
|
Complete (Recurring) |
Too wet no contractor on site reschedule |
| 12/08/2022 |
ENGR Grading Final |
|
Complete (Recurring) |
|
| 12/08/2022 |
ENGR Grading Final |
|
Complete (Recurring) |
|