Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP21-0041

Parcel: 13315305A

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
08/31/2022 ENGR Grading Final BBENEDON Approved Entered by VVERA1 - Approved. Enclosure slab and bollards.
08/31/2022 ENGR Grading Final BBENEDON Partial Approval Entered by VVERA1 - Partially approved. Trash enclosure bollards. Mike Epstein
07/15/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Pre-grout. Ben and Zac. 2208 N CAMINO PRINCIPAL
07/15/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Ben with Epstein 2200 N CAMINO PRINCIPAL
07/07/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Trash enclosures one and two, footings. Ben with Epstein 2208 N CAMINO PRINCIPAL
07/07/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Trash enclosures one and two, footings. Ben with Epstein 2200 N CAMINO PRINCIPAL
07/06/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. City of Tucson trash enclosure detail sent to band with Epstein at 83345608.
10/12/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Accessible walkways pre-slab. Handrails and edge protection required at accessible route, Northwest corner of building at emergency exit. 2200 N Camino Principal,
10/07/2022 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Work within the right of way requires-right of way permit and inspection. Mike with Epstein
09/13/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Curbs along the northern portion of site. No issues with minor discrepancy at water meters. 2208 N CAMINO PRINCIPAL
09/13/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Curbs along the northern portion of site. No issues with minor discrepancy at water meters. 2200 N CAMINO PRINCIPAL
08/29/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN /CHECKING THE SIDEWALK. 2208 N CAMINO PRINCIPAL
08/29/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN /CHECKING THE SIDEWALK. 2200 N CAMINO PRINCIPAL
08/23/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Rough grading 2208 N CAMINO PRINCIPAL
08/23/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Rough grading. Mike with Epstein on site 2200 N CAMINO PRINCIPAL
07/19/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Site grading 2200 N Camino Principal,
04/15/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued
04/12/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Utility work in progress. Construction debris piles on site 2200 N Camino Principal
03/16/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Mike with Epstein. Engineering has no issues with electrical panel protruding into sidewalk. 2200 N Camino Principal
03/01/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - CONTINUED AT THIS TIME. CREWS ARE STILL WORKING MAINLY KN VERTICAL WORK WITHIN THE STRUCTURES. 2208 N CAMINO PRINCIPAL
03/01/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - CONTINUED AT THIS TIME. CREWS ARE STILL WORKING MAINLY KN VERTICAL WORK WITHIN THE STRUCTURES. 2200 N CAMINO PRINCIPAL
12/22/2021 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Mike with Epstein. Schedule inspection for retaining wall with building and engineering. Photo documentation may be excepted
12/08/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No site work at this time. Contractor completing building changes. Mike with Epstein
10/01/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Building progress
11/10/2021 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued.Building construction in progress material stock piles on site. Temporary fencing in place.
01/10/2023 ENGR Grading Final Partial Pass OK to start landscaping
01/10/2023 ENGR Grading Final Partial Pass tco
01/10/2023 ENGR Grading Final Passed
01/26/2023 ENGR Grading Final Passed
01/26/2023 ENGR Grading Final Passed
11/04/2022 ENGR Grading Final Re-inspection required MOST WORK ON THIS SITE IS GOING VERTICAL, SITE WORK IS NOT REALLY GONE PAST SIDEWALKS AND CURBS
12/05/2022 ENGR Grading Final Complete (Recurring) Too wet no contractor on site reschedule
12/08/2022 ENGR Grading Final Complete (Recurring)
12/08/2022 ENGR Grading Final Complete (Recurring)