Inspection History: SITE - Stormwater Follow-up
Permit Number - DP21-0039
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/13/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by VVERA1 - CN / CONTRACTOR FORMED AND POURED THE MANHOLE WITH OUT INSPECTIONS .CONTRACTOR NEED THE ENGINEER OF RECORD TO CERTIFIED THE POUR AND THE FORMS. |
05/12/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN /INSTALLING 42” SRP GOING NORTH .GOOD AS OF TODAY. |
05/05/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN /NO CONCERNS AT IS TIME |
05/02/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by VVERA1 - CN / INSTALLING 48” S R P ON THE NORTH END OF THE BUILDING. |