Permit: DP21-0039

Parcel: 132131310

Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP21-0039

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
06/13/2022 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN / CONTRACTOR FORMED AND POURED THE MANHOLE WITH OUT INSPECTIONS .CONTRACTOR NEED THE ENGINEER OF RECORD TO CERTIFIED THE POUR AND THE FORMS.
05/12/2022 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by RSALDAT1 - CN /INSTALLING 42” SRP GOING NORTH .GOOD AS OF TODAY.
05/05/2022 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by NGARCIA3 - CN /NO CONCERNS AT IS TIME
05/02/2022 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN / INSTALLING 48” S R P ON THE NORTH END OF THE BUILDING.
04/13/2022 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN