Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP21-0039
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
08/23/2022 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN /PAVING THE PARKING LOT. |
01/05/2023 | ENGR Engineering Final | Partial Pass | Contractors running on temporary power waiting for electrical power and it there is sidewalks that need to be repaired | |
01/06/2023 | ENGR Engineering Final | Partial Pass | Complete all worked and shown on the approved set of plans this will include deepening the water harvesting minor basins throughout the site so that there is at least 6 inches of open space from the bottom of the inlet structure to the bottom of the basin. Install the long-term bicycle parking As shown on the approved plans. Install the extruded curb on the east side of the parking lot adjacent to the trashing closure has shown on the approved plans recall this site for a reinspection once all work has been completed | |
02/23/2023 | ENGR Engineering Final | Complete (Recurring) | The letter the contractor sent to me was not stamped by the City Of Tucson contractor needs to submit changes on the set of plans . | |
07/28/2023 | ENGR Engineering Final | Passed | ||
12/29/2022 | ENGR Engineering Final | Complete (Recurring) | It’s okay to give them a TCO And a partial for the engineering final |